Deskripsi pekerjaan
Ellipse Projects adalah perusahaan infrastruktur teknologi bernilai tambah tinggi yang menangani proyek rumah sakit, pusat data, dan sistem telekomunikasi secara global. Sebagai Engineering Senior Manager, Anda akan memimpin dan mengelola Departemen Teknik di seluruh proyek yang dikelola oleh Ellipse Projects Indonesia. Peran ini bertanggung jawab mengawasi fase desain proyek, termasuk verifikasi dan koordinasi antar disiplin teknik. Anda akan memberikan dukungan teknis selama fase tender hingga konstruksi, memastikan kepatuhan terhadap standar, regulasi, dan spesifikasi klien. Posisi ini menuntut kemampuan manajemen proyek yang kuat, kepemimpinan tim multidisiplin, serta keahlian dalam mengelola kualitas, jadwal, dan anggaran proyek secara simultan.
Tanggung jawab: Lead and manage the Engineering Department, covering all engineering disciplines across all projects managed by Ellipse Projects Indonesia; Review and verify engineering design deliverables, including but not limited to design calculations, drawings, models, simulations, and technical analyses for all disciplines, including Structural, Architectural, MEP, Biomedical, and other relevant d; Support the Project Director during tender reviews, technical clarifications, negotiations, contract evaluations, and variation order assessments; Review and verify subcontractors’ design submissions, shop drawings, installation methodologies, and other technical documentation to ensure compliance with project requirements; Ensure that all engineering designs comply with project specifications, applicable codes and regulations, industry standards, and sustainability requirements; Provide engineering support to site teams, including technical clarifications, review of shop drawings and as-built drawings, site measurement verification, and maintenance of engineering documentation; Monitor and control engineering documentation, including drawing registers, material submittals, technical query logs, change order registers, and other engineering records to ensure document integrity, accuracy, and traceability; Coordinate with project teams, consultants, clients, subcontractors, and other departments to ensure effective integration of design and construction activities; Report engineering and design progress to the Project Director, identify technical risks and issues, and recommend solutions to improve design efficiency, constructability, and project performance; Ensure engineering activities are executed in accordance with the project schedule, quality objectives, and company procedures; Provide technical advice to the Presales Department for potential projects, including review of client requirements, feasibility assessments, conceptual engineering solutions, cost optimization recommendations, and risk identification; Participate in project meetings, technical workshops, coordination meetings, client meetings, management reviews, and other internal or external meetings as necessary to support project execution, engineering coordination, decision-making, and busine.
Kualifikasi: Bachelor's Degree in Civil Engineering, Structural Engineering, or a related discipline; Minimum 15 years of professional experience in building construction and/or engineering roles, including experience in a managerial or leadership position. Relevant professional certifications will be considered an advantage; 3 . Fluent in English, both written and spoken; Demonstrates professional behaviour, strong interpersonal and communication skills, and the ability to lead and develop multidisciplinary teams; Possesses strong consultancy and site-based experience, with the ability to review engineering and construction drawings, supervise site execution, issue technical instructions, and effectively resolve technical issues; Specific knowledge, skills, and experience required:; Extensive experience in the design review, coordination, and management of hospital and healthcare facility projects; Proven experience in implementing, supervising, and optimizing construction methodologies, work sequencing, and construction procedures for hospital and healthcare projects; Proficient in the use of AutoCAD and BIM-based 3D software for design development, multidisciplinary coordination, clash detection, and construction technical administration; Thorough understanding of applicable building codes, engineering standards, healthcare facility regulations, and construction best practices; Strong project management, problem-solving, decision-making, and stakeholder management skills; Ability to manage multiple projects simultaneously while maintaining quality, schedule, and budget objectives.
Tanggung jawab
- Lead and manage the Engineering Department, covering all engineering disciplines across all projects managed by Ellipse Projects Indonesia
- Review and verify engineering design deliverables, including but not limited to design calculations, drawings, models, simulations, and technical analyses for all disciplines, including Structural, Architectural, MEP, Biomedical, and other relevant d
- Support the Project Director during tender reviews, technical clarifications, negotiations, contract evaluations, and variation order assessments
- Review and verify subcontractors’ design submissions, shop drawings, installation methodologies, and other technical documentation to ensure compliance with project requirements
- Ensure that all engineering designs comply with project specifications, applicable codes and regulations, industry standards, and sustainability requirements
- Provide engineering support to site teams, including technical clarifications, review of shop drawings and as-built drawings, site measurement verification, and maintenance of engineering documentation
- Monitor and control engineering documentation, including drawing registers, material submittals, technical query logs, change order registers, and other engineering records to ensure document integrity, accuracy, and traceability
- Coordinate with project teams, consultants, clients, subcontractors, and other departments to ensure effective integration of design and construction activities
- Report engineering and design progress to the Project Director, identify technical risks and issues, and recommend solutions to improve design efficiency, constructability, and project performance
- Ensure engineering activities are executed in accordance with the project schedule, quality objectives, and company procedures
- Provide technical advice to the Presales Department for potential projects, including review of client requirements, feasibility assessments, conceptual engineering solutions, cost optimization recommendations, and risk identification
- Participate in project meetings, technical workshops, coordination meetings, client meetings, management reviews, and other internal or external meetings as necessary to support project execution, engineering coordination, decision-making, and busine
Kualifikasi
- Bachelor's Degree in Civil Engineering, Structural Engineering, or a related discipline
- Minimum 15 years of professional experience in building construction and/or engineering roles, including experience in a managerial or leadership position. Relevant professional certifications will be considered an advantage
- 3 . Fluent in English, both written and spoken
- Demonstrates professional behaviour, strong interpersonal and communication skills, and the ability to lead and develop multidisciplinary teams
- Possesses strong consultancy and site-based experience, with the ability to review engineering and construction drawings, supervise site execution, issue technical instructions, and effectively resolve technical issues
- Specific knowledge, skills, and experience required:
- Extensive experience in the design review, coordination, and management of hospital and healthcare facility projects
- Proven experience in implementing, supervising, and optimizing construction methodologies, work sequencing, and construction procedures for hospital and healthcare projects
- Proficient in the use of AutoCAD and BIM-based 3D software for design development, multidisciplinary coordination, clash detection, and construction technical administration
- Thorough understanding of applicable building codes, engineering standards, healthcare facility regulations, and construction best practices
- Strong project management, problem-solving, decision-making, and stakeholder management skills
- Ability to manage multiple projects simultaneously while maintaining quality, schedule, and budget objectives
Informasi lowongan
- Tipe pekerjaan
- Full-time
- Pendidikan
- S1
- Gaji
- Negosiasi
- Batas lamaran
- 23 Desember 2026
Cara melamar
Kontak dan cara melamar muncul setelah kamu masuk atau membuat akun gratis.